Many plants are installing AQCS equipment in response to the tightening restrictions on flue gas emissions. Tri-Tech has extensive experience supporting these projects including:
- Flue Gas Desulfurization (FGD) Systems
- Wet Type
- Spray Dryer Absorber (SDA)
- Dry Sorbent Injection (DSI)
- Circulating Fluidized Bed (CFB)
- Pulse Jet Fabric Filters (Baghouses)
- Dry and Wet Type Electrostatic Precipitators (ESP)
- Fly Ash Handling Systems, including the new F. L. Smidth Air Slide Systems
- Selective Catalytic Reduction (SCR) and Non-Selective (SNCR)
- Carbon Monoxide (CO) Modules
- Mercury Removal Systems
- Low-NOx Burners
For a new plant, Tri-Tech can address all equipment/systems, even where it overlaps the training equipment vendors may also provide. Or we can develop a BOP training program that compliments the major equipment vendor training, and tie the entire project together. Tri-Tech recommends a complete Training Package. This includes:
- Training Manual
- Operating Procedures
- Classroom Instruction
- OJT Program
- Testing
Ideally, please contact us at least 8 months prior to Mechanical Completion for the most effective training window for your personnel. If your timeframe is tight, Tri-Tech has proven methods to provide effective training in much shorter notice.
Let us send you a package of example training material.