| Project |
City |
State |
Country |
Client |
MW |
Equipment |
Services |
| AES – Wolf Hollow |
Granbury |
TX |
USA |
NEPCO |
715 |
MHI501G CC Plant |
Developed and Implemented a 2
Week Training Program |
| Air Liquide – Geismar Cogeneration |
Geismar |
LA |
USA |
Lockwood Greene Engineers, Inc. |
100, 125 |
GE 7EA CC Plant, GE 6B CC Plant |
Developed Integrated Plant Operations Manual
for Startup and Shutdown, Developed and Implemented 1 Week Training
Program |
| Air Liquide – Scotford Cogen |
Edmonton |
Alberta |
Canada |
NEPCO |
80 |
GE 6 CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Albany State University |
Albany |
GA |
USA |
ALCON Associates |
- |
Chillers / Boilers for campus utilities |
Developed O&M Manuals and on-site instruction |
Ameren Grand Tower |
Jackson County |
IL |
USA |
PCS |
500 |
W501FD CC Plant |
Developed SDs, Ops, and Lesson Plans for this repowering project. |
Ameren Remote CTs |
Pickneyville |
IL |
USA |
Ameren |
250 |
GE LM6000, Frame 6B, and W501D. |
Developed a 3-day training program for remote operation of the
CT sites. |
| Arapahoe Power Plant Expansion |
Arapahoe |
CO |
USA |
Black Hills Energy |
130 |
GE LM 6000 CC Plant |
Developed and Implemented a 1 Week
Training Program |
| Ashtabula Cogen |
Ashtabula |
OH |
USA |
Trigen Cinergy Solutions |
50 |
Rolls Royce CC Plant |
Developed and Implemented a 1 Week
Training Program, Developed Startup Test Procedures |
| Bajio Power Plant |
San Luis de la Paz |
Guanajuato |
Mexico |
Energia Azteca |
489 |
GE 7FA CC Plant |
Develop Integrated Plant Operating Procedures |
| Barranquilla Power Station |
Barranquilla |
Columbia |
Columbia |
ABB Power Generation |
750 |
ABB 11N2 SC Plant |
Develop CT O&M Manual |
| BASF – Port Arthur Cogen |
Pt. Arthur |
TX |
USA |
BASF Corporation / Lockwood Greene Engineers,
Inc. |
85 |
GE 7EA CC Plant |
Instructed a 2-day CC Fundamentals Course / Developed
Standard Operating Procedures |
| BASF Freeport Cogen |
Freeport |
TX |
USA |
Lockwood Greene Engineers, Inc. |
81 |
GE 7EA CC Plant |
Developed and Implemented Operating Procedures,
ST Training, Developed Startup Test Procedures |
| BASF Geismar Cogen |
Geismar |
LA |
USA |
Lockwood Greene Engineers, Inc. |
80 |
GE 6B CC Plant |
Developed and Implemented a 2 Week
Training Program |
|
BASF Geismar
|
Geismar
|
LA
|
USA
|
BASF |
- |
Various Utility Boilers |
Developed and Implemented a site
specific 2 Day Boiler Course for the Utilities Department |
| Bayside Repowering Project |
Tampa |
FL |
USA |
TECO |
1895 |
GE 7FA CC Repowering of Gannon Coal Plant |
Developed and Implemented a 2 Week
Training Program |
| BCH Energy |
Fayetteville |
NC |
USA |
Metric Constructors |
12 |
RDF and Power Plant |
Provided Startup Services |
Beatrice Plant |
Beatrice |
NE |
USA |
TIC - The Industrial Company |
300 |
GE LM6000 Peaker |
Developed an Integrated Plant Operating Procedure |
Beacancour Cogen Plant |
Montreal |
QUE |
Canada |
SNC-Lavalin Constructors |
550 |
GE 7FA / D11 Combined Cycle |
Developed and Implemented a 4 Week
Training Program in French. |
Bethlehem Energy Center |
Glenmont |
NY |
USA |
PSEG Power NY |
750 |
GE 7FA / D11 Combined Cycle |
Developed and Implemented a 5 Week
Training Program and OJT Program. |
| Black Hawk Station |
Borger |
TX |
USA |
Operational Energy Corp. |
200 |
W501D5A CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Black Hills - Fountain Valley Power Plant |
Colorado Springs |
CO |
USA |
NEPCO |
240 |
GE LM6000 SC Plant |
Developed and Implemented a 1 Week
Training Program |
Bluffview Power Plant |
Farmington |
NM |
USA |
SNC-Lavalin Constructors |
60 |
GE LM6000 with Alstom STG |
Developed and Implemented a 1 Week
Training Program |
| Brighton Beach Power |
Windsor |
Ontario |
Canada |
ATCO Power / Ontario Power Generation |
580 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Brownsville Peaker |
Brownsville |
TN |
USA |
NEPCO |
460 |
W501D5 SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Bryan Foods |
West Point |
MS |
USA |
Compliance Technologies |
- |
Ammonia Chillers |
OSHA 1910.119 PSM Compliance Documents |
| Caledonia Peaker |
Caledonia |
MS |
USA |
NEPCO |
450 |
GE 7EA SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Calpine – Goldendale Power Plant |
Goldendale |
WA |
USA |
The Industrial Company |
250 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
Celanease Power Plant |
Narrows |
VA |
USA |
Cinergy |
- |
Solid Fuel Boilers |
Developed Emergency Response Procedures for critical
alarms and plant conditions. |
| Cemex – TEG Plant |
Tamuin |
San Luis Potosi |
Mexico |
Sithe Energies |
230 |
CFB / Coal Fired |
Developed a Plant Administrative
Procedure Manual |
| Central Power and Light |
Tulsa |
OK |
USA |
CP&L |
- |
Coen / Foxboro BMS |
Developed Burner Controls manual |
| Cogentrix – Caledonia Power Plant |
Caledonia |
MS |
USA |
NEPCO |
810 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Cogentrix - Green Country Power Plant |
Jenks |
OK |
USA |
NEPCO |
810 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Cogentrix - Ouachita Energy |
Sterlington |
LA |
USA |
NEPCO |
820 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Cogentrix – Southaven Power Plant |
Southaven |
TN |
USA |
NEPCO |
810 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Cogentrix- Rathdrum Power Plant |
Rathdrum |
ID |
USA |
The Industrial Company |
273 |
GE 7FA CC Plant |
Developed and Implemented a 1 Week
Training Program |
| Conectiv - Midtown Thermal Plant |
Atlantic City |
NJ |
USA |
Operational Energy Corp. |
- |
York Chillers / Zurn Boilers |
Developed and Implemented a 2 Week
Operator Training Program, CMMS Consulting, Administrative Manual,
Emergency Action
Plan, Spill Control and Countermeasure Plan, PM Program, Spare
Parts List, Lockout/Tagout Training, Maximo CMMS Training |
| Coyote Springs Power Plant |
Boardman |
OR |
USA |
The Industrial Company |
280 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Crossroads Energy Center |
Clarksdale |
MS |
USA |
Burns and McDonnell |
300 |
GE 7FA SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Delta Stamping Plant - GM |
Lansing |
MI |
USA |
Cinergy Solutions / GM |
- |
Chillers and Boilers |
Developed and Implemented a 1 Week
Training Program. Also developed Schedule 8 Acceptance Test Procedures,
Functional Test Procedures, and provided Startup Support Services,
including Startup Personnel and Startup Management. |
Delta Township Utilities
- GM |
Lansing |
MI |
USA |
Cinery Solutions |
|
Chillers and Boilers |
Developed and Implemented a 1 Week
Training Program and provided Startup Services |
| Doyle Peaker |
Monroe |
GA |
USA |
Enron North America / NEPCO |
340 |
GE 7B and GE 7EA SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Eastex Power Plant |
Longview |
TX |
USA |
Parsons Energy & Chemical Group |
450 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Edison Source |
Anaheim |
CA |
USA |
Edison Source |
- |
Commercial Refrigeration |
Developed Years 5- 6 apprenticeship programs
and manuals for refrigeration service technicians |
| Electrobolt Peaking Plant |
Rio De Janeiro |
RJ |
Brazil |
NEPCO |
364 |
GE LM 6000 SC Plant |
Developed a 2 Week Training Program |
| Ennis Tractabel Power Plant |
Ennis |
TX |
USA |
Parsons Energy & Chemical Group, Inc. |
350 |
W501G CC Plant |
Developed and Implemented a 2 Week
Training Program |
Equus Power LP |
Village of Freeport |
NY |
USA |
PIC |
45 |
GE LM6000 Simple Cycle |
Developed plant specific Operating Procedures |
| Fauji – Kabirwala Power Complex |
Kabirwala |
District Khanewal |
Pakistan |
Operational Energy Corp. |
157 |
W251B CC Plant |
Developed and Implemented a 12
Week Training Program |
| Fife Power Project |
Fife |
Scotland |
United Kingdom |
NEPCO |
123 |
GE 6 CC Plant |
Developed and Implemented a 2 Week
Training Program |
Ford Heights Plant; Geneva Energy |
Ford Heights |
IL |
USA |
Bluewater Energy Solutions / Wood
Group |
24 |
Shredded Tire Boiler and
STG |
Developed and Implemented a 3 Week
Training Program and an OJT Program |
| Fraser Cogeneration |
Edmunston |
New Brunswick |
Canada |
NEPCO |
38.5 |
Zurn / NEPCO Wood Burning Boiler and GE Steam
Turbine |
Developed and Implemented a 4 Week
Training Program |
Freeport Electric |
Village of Freeport |
NY |
USA |
PIC |
45 |
GE LM6000 Simple Cycle |
Developed plant specific Commissioning
Procedures and Operating Procedures |
| Frontera Generation |
Mission |
TX |
USA |
Duke Fluor Daniel |
477 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Gantt Hydro Plant |
Gantt |
AL |
USA |
Alabama Electric Cooperative |
1.5 |
GE Type ATB52-1500M-138 |
Developed Hydro Plant Operations and Maintenance
Training Manuals |
| Gaza Power Project |
Gaza City |
Gaza Strip |
Israel |
Enron Global Assets |
136 |
ABB 11N1 CC Plant |
Developed a 1 Week Training Program |
| Gila River Power Station |
Gila Bend |
AZ |
USA |
NEPCO and TECO Power Services |
2200 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program, 3 Day Combined Cycle Fundamentals, 1 Week
Gas Turbine, and 1 Week
Steam Turbine Training |
| Gleason Peaker |
Gleason |
TN |
USA |
Enron North America / NEPCO |
510 |
W501F SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Goose Creek Power Plant |
Monticello |
IL |
USA |
Burns and McDonnell |
510 |
GE 7EA SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Griffith Energy |
Kingman |
AZ |
USA |
Pacific Power and Light |
590 |
GE 7FA CC Plant |
Developed Administrative Manuals |
GTAA Cogeneration |
Toronto |
ONT |
Canada |
SNC-Lavalin Constructors |
117 |
GE LM6000, OTSG, & STG Combined
Cycle Plant |
Developed and Implemented a 2 Week
Training Program |
| Hartwell Cogen |
Hartwell |
GA |
USA |
ESBI |
300 |
7FA Simple Cycle Plant |
Training Needs Assessment |
| Holland Energy Facility |
Beecher City |
IL |
USA |
Parsons Chemical and Energy Group |
600 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Kyrene Generating Station |
Tempe |
AZ |
USA |
The Industrial Company |
250 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Lagos Barge |
Lagos Lagoon |
Lagos |
Nigeria |
Enron Global Assets |
290 |
GE 6B SC Barge Mounted Units |
Developed and Implemented a 1 Week
Training Program |
| Lansing I – GM Grand River |
Lansing |
MI |
USA |
Trigen Cinergy Solutions |
- |
Chillers / Boilers |
Developed and Implemented 1 Week Training Program,
Startup Test Procedures, ST Training |
Lawrence County Generating Plant |
Mitchell |
IN |
USA |
TIC |
258 |
LM6000 Peaking Plant |
Developed and Implemented a 1 Week
Training Program |
Leon Creek Power Project |
San Antonio |
TX |
USA |
TIC |
200 |
LM6000 Peaking Plant |
Developed and Implemented a 1 Week
Training Program. |
LES J Street Station |
Lincoln |
NE |
USA |
Lincoln Electric System (LES) |
50 |
WH 251B Peaker |
Developed and Implemented a 1 Week
Training Program with Operating Procedures |
LES Rokeby Station |
Lincoln |
NE |
USA |
Lincoln Electric System (LES) |
220 |
1 GE MS7001B and 2 ABB 11N's Peaker
Plant with Ice Storage. |
Developed and Implemented a 1 Week
Training Program with Operating Procedures |
| Lilly - Clinton |
Clinton |
IN |
USA |
Enron Building Services |
- |
Chillers and Boilers |
Developed and Implemented a 2 Week
Training Program |
| Lilly – Greenfield |
Greenfield |
IN |
USA |
Enron Building Services |
- |
Chillers and Boilers |
Developed and Implemented a 1 Week
Training Program |
| Lilly – Lilly Corporate Center |
Indianapolis |
IN |
USA |
Enron Building Services |
- |
Chillers and Boilers |
Developed and Implemented a 1 Week
Training Program |
| Lincoln Peaker |
Manhattan |
IL |
USA |
Enron North America / NEPCO |
600 |
GE 7EA SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Linden – Unit 6 |
Linden |
NJ |
USA |
NEPCO |
160 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| LS Power – Kendall Station |
Kendall County |
IL |
USA |
NEPCO and LSP Kendall Energy LLC |
1160 |
GE 7FA CC Plant |
Developed and Implementeda 2 Week
Training Program, 3 Day Combined Cycle Fundamentals, 1 Week
Gas Turbine, and 1 Week
Steam Turbine Training |
| LS Power - Nelson |
Nelson |
IL |
USA |
NEPCO |
1160 |
GE 7FA CC Plant |
Developed a 2 Week Training Program |
| Manaus Power Project |
Manaus |
Amazonas |
Brazil |
El Paso International |
250 |
GE 7B/E SC Plant w/ P&W FT4C-1 peakers |
Developed Emergency Operating Procedures, Developed
Plant Operating Procedures |
| McCormick Spice |
Atlanta |
GA |
USA |
McCormick Spice, Co. |
- |
Dry Food Packaging |
CMMS Implementation and Spare Parts consolidation |
| McWilliams Station Repowering |
Andalusia |
AL |
USA |
Alabama Electric Cooperative |
148 |
Siemens 84.2 Combined Cycle Repower |
Training Program consultation, Training Manual
Development and Course Instruction |
MEAG, Wansley Unit 9 |
Franklin |
GA |
USA |
GE Power Systems |
500 |
GE 7FA CC Plant |
Developed plant specific Training
Manual and Operating Procedures for all BOP Systems. |
Meredosia Power Station |
Meredosia |
IL |
USA |
PCS / Ameren |
750 |
3 Coal Fired Units and 1
Oil Fired Unit |
Developed plant specific System
Descriptions and OJT Program for the unit Electrical Distribution
Systems, Station Switchyard,
250V DC Power Systems, and 120V UPS Systems |
| New Albany Peaker |
New Albany |
MS |
USA |
NEPCO |
360 |
GE 7B SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Nexfor Fraser Papers Cogeneration Plant |
Berlin-Gorham |
NH |
USA |
AEP Pro Serv |
25 |
Package Boiler and Steam Turbine |
1 Week BOP Training Program |
North Pole Expansion Project |
North Pole |
AK |
USA |
PIC |
80 |
GE LM6000, OTSG, & STG Combined
Cycle Plant |
Developed and Implemented a 2 Week
Training Program; taught twice. |
| Ohio Edison, Niles Station |
Akron |
OH |
USA |
ABB Environmental Systems |
250 |
Wet Type FGD Scrubber |
Developed O&M Manuals |
| Oklahoma Arcadian Utilities - GM |
Oklahoma City |
OK |
USA |
Cinergy Solutions |
- |
Chillers / Boilers |
Developed and Implemented a 1 Week
Training Program |
| Pentagon CHP |
Washington |
DC |
USA |
Fossil Consulting Services |
- |
York Chillers, B&W Boilers |
Developed System Training Manuals for this Heating
/ Chiller Plant |
| Penuelas Power Project |
Penuelas |
Puerto Rico |
Puerto Rico |
NEPCO |
510 |
W501F CC Plant |
Developed and Implemented a 4 Week
Training Program, Developed Plant Standard Operating Procedures |
| Perryville Station |
Perryville |
LA |
USA |
Burns and McDonnell |
560 |
GE 7FA CC Plant |
Developed and Implemented a 1 Week
Training Program |
| Philadelphia Naval Shipyard |
Philadelphia |
PA |
USA |
Cinergy Solutions |
- |
Chillers and Boilers |
Developed Operating Procedures and Administrative
Procedures for this Utility |
| Point A Hydro Plant |
Gantt |
AL |
USA |
Alabama Electric Cooperative |
5.2 |
GE Type ATB – three units |
Developed Hydro Plant Operations and Maintenance
Training Manuals |
| PREPA – Cambalache Station |
Cambalache |
Puerto Rico |
Puerto Rico |
Lockwood Greene Engineers, Inc. |
248 |
ABB 11N1 CC Plant |
Developed and Implemented a 1 Week
Training Program |
PSEG Bethlehem Energy Center
|
Glenmont
|
NY
|
USA
|
PSEG Power
|
750
|
GE 7FA / D11 Combined Cycle
|
Developed and Implemented a 5 Week
Training Program and OJT Program.
|
PSEG Linden Station |
Linden |
NJ |
USA |
PSEG Power |
1200 |
GE 7FA / D11 Combined Cycle |
Developed a PM/PdM Program |
| Public Service of Oklahoma, Northeast Unit 1 |
Oolagah |
OK |
USA |
The Industrial Company |
500 |
GE 7FA CC Repowered Plant |
Developed and Implemented a 1 Week
Training Program |
| Red Hawk |
Phoenix |
AZ |
USA |
Pinnacle West Energy |
530 |
GE 7FA CC Plant |
Developed Integrated Plant Operating Procedures |
| Riley Boilers |
Worcester |
MA |
USA |
Power Industry Consultants |
- |
Spare Parts Operation |
Consulting Services |
| Rojana Power Plant |
Rojana |
Ayuttaya |
Thailand |
Thai-NEPCO |
122 |
GE LM-6000 CC Plant |
Developed and Implemented a 4 Week
Training Program |
| Saguaro Power Plant |
Saguaro |
AZ |
USA |
Pinnacle West |
80 |
GE 7EA SC Plant |
Developed Integrated Operating Procedures |
| SahaCogen |
Sriracha |
Chonburi |
Thailand |
Thai-NEPCO |
122 |
GE LM-6000 CC Plant |
Developed and Implemented a 4 Week
Training Program |
| Salt River Project – Navaho Generating Station |
Tempe |
AZ |
USA |
ABB Environmental Systems |
- |
Wet Type FGD Scrubber |
Developed O&M Manuals |
Salt River Project Santan Expansion |
Gilbert |
AZ |
USA |
Salt River Project |
825 |
GE 7FA / D11 Combined Cycle |
Developed and Implemented a 2 Week BOP and Integrated
Operations Training Program. |
Salt River Project Desert Basin |
Casa Grande |
AZ |
USA |
Salt River Project |
588 |
2 W501F's with 1 GE D11 STG |
Developed and Implemented a 2 Week BOP and Integrated
Operations Training Program. |
Salt River Project Desert Basin
|
Casa Grande
|
AZ
|
USA
|
Salt River Project
|
588
|
2 W501F's with 1 GE D11 STG
|
Developed and Implemented a 1 Week Steam Turbine Generator
Course; taught 3 times. |
** Salt Valley Generating Station |
Lincoln |
NE |
USA |
Lincoln Electric System (LES) |
120 |
LM6000 Combined Cycle Expansion |
Developed and Implemented a 2 Week
Training Program to include Combined Cycle Fundamentals for LES
Management |
| Sand Hill Energy Facility |
Austin |
TX |
USA |
NEPCO |
178 |
GE LM 6000 SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Scottpolar |
Phoenix |
AZ |
USA |
ScottPolar Refrigeration |
- |
Commercial Refrigeration |
Developed Multi-year apprenticeship programs
and manuals for refrigeration service technicians |
Sequoia Pipe Project |
Defiance |
OH |
USA |
Johns Manville / Lockwood Greene
|
- |
Pipe Insulation Manufacturing Plant |
Developed a comprehensive training program for
production and maintenance technicians for newly installed
pipe insulation manufacturing equipment. |
Sheboygan Falls Energy Facility |
Sheboygan Falls |
WI |
USA |
Burns & McDonnell |
300 |
GE 7FA Simple Cycle |
Developed and Implemented a 1 Week
Training Program |
Sheboygan Remote CTs |
Sheboygan Falls
|
WI
|
USA
|
Alliant Energy |
- |
GE CTGs |
Developed and Implemented a 3 day
training course for remote CTG Operations. |
| Shreveport Red River Utilities - GM |
Shreveport |
LA |
USA |
Cinergy Solutions |
- |
Chillers / Boilers |
Developed and Implemented a 1 Week
Training Program |
| ** Silverhawk Power Plant |
Apex |
NV |
USA |
Jones LG, LLC |
570 |
W501F CC Plant |
2 Week Training Program |
Skikda Power Plant |
Skikda |
Algeria |
North Africa |
SNC-Lavalin |
550 |
GE 9FA and Alstom STG Combined
Cycle
|
Developed and Implemented a 2 Week
Simple Cycle Training Program, and a 2 week Combined Cycle Training
Program; all delivered and taugth in French.
|
SMUD - HVAC |
Sacramento |
CA |
USA |
SMUD |
- |
HVAC Instuctor Services |
Developed and Instructed a 1 Day
HVAC Fundamentals Seminar |
| SMUD – McClellan AFB |
Sacramento |
CA |
USA |
AEP - Proserv |
50 |
GE 7EA CC Plant |
Developed Operating Procedures for Air Pollution
Upgrade Project |
| South Houston Green Power |
Texas City |
TX |
USA |
SHGP / Cinergy Solutions |
570 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program and Startup Commissioning Test Procedures |
| St. Paul Cogeneration Facility |
St. Paul |
MN |
USA |
Trigen Cinergy Solutions |
37.5 |
Wood Burning Boiler |
Functional Descriptions, Operating Procedures,
Training Manual, Startup Test Procedures, Preventive Maintenance
Procedures |
| ** Sweeny Cogeneration |
Old Ocean |
TX |
USA |
Operational Energy Corp. |
480 |
W501B CC Plant |
Developed and Implemented a 2 Week
Training Program |
| TECO – Hardee Station |
Lakeland |
FL |
USA |
NEPCO |
75 |
GE 7EA SC Plant |
Developed and Implemented a 1 Week
Training Program |
Teverola Power Plant |
Teverola |
Italy |
Italy |
GE Power Systems |
400 |
GE 9FA & D11; Combined Cycle Plant
|
Developed Operating Procedures for
all plant systems and equipment; converted to Italian. |
| Texas City – BP Amoco Cogeneration Plant |
Texas City |
TX |
USA |
Cinergy Solutions |
800 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Tiverton Power Project |
Tiverton |
RI |
USA |
Tiverton Power Associates |
240 |
GE 7FA CC Plant |
Developed Training Manuals and Operating Procedures |
| Union Carbide – Seadrift Cogen |
Pt. Lavaca |
TX |
USA |
NEPCO |
40 |
GE 6 CC Plant |
Developed and Implemented a 2 Week
Training Program |
| Union Power Partners |
El Dorado |
AR |
USA |
NEPCO and TECO Power Services |
2200 |
GE 7FA CC Plant |
Developed and Implemented a 2 Week
Training Program, 3 Day Combined Cycle Fundamentals, 1 Week
Gas Turbine and 1 Week
Steam Turbine Training |
Valladolid Energy Center |
Valladolid |
Yucatan |
Mexico |
Calpine |
700 |
GE 7FA & D11; 2x1 Combined Cycle
Plant |
Developed and Implemented a 2 Week
Training Program;all delivered and taught in Spanish |
| Vermont Gasifier |
Burlington |
VT |
USA |
Operational Energy Corporation / FERCO |
- |
Biomass Gasifier |
Developed and Implemented a 2 Week
Training Program |
| Virginia Power |
Glen Allen |
VA |
USA |
Virginia Power |
- |
Power Plants |
CMMS Consultation Services |
| West Phoenix Power Plant |
Phoenix |
AZ |
USA |
Lockwood Greene Engineers, Inc, Arizona Public
Service, The Industrial Company |
1005 |
W501G CC Units, GE 7EA CC Units |
Developed and Implemented a 1 Week
Training Programs, Integrated Plant Operating Procedures, PM
Procedures |
| Wheatland Peaker Station |
Wheatland |
IN |
USA |
Enron North America / NEPCO |
480 |
W501D5 SC Plant |
Developed and Implemented a 1 Week
Training Program |
| Zeeland Power Station |
Zeeland |
MI |
USA |
Burns & McDonnell |
560 |
GE 7FA CC Plant |
Developed and Implemented a 1 Week
Training Program |